Uniper and VNG produce first green hydrogen at 30 MW Bad Lauchstädt electrolyzer in Germany
Uniper and VNG have produced their first green hydrogen at a 30 MW electrolyzer at the Bad Lauchstädt Energy Park in Saxony-Anhalt, powered by renewable electricity from a connected wind farm. The facility is entering a testing phase to assess the components of its integrated energy system. Hydrogen will move through a roughly 25 km converted natural gas pipeline, with deliveries to TotalEnergies' Leuna refinery and full commissioning expected in 2027. Separately, researchers estimated West Africa–Europe pipeline corridors could carry up to 7.16 million metric tons of green hydrogen per year.

