Image: pv magazine IndiaWaaree Energy Storage Solutions, a subsidiary of Waaree Energies, has started commercial production at a battery pack manufacturing line with 5.15 GWh of annual capacity in Rola, Valsad, Gujarat. The line is the second step in the company's 20 GWh energy storage manufacturing roadmap, after a 5.15 GWh BESS container facility opened at the same site in July 2026. The expansion is backed by INR 1,003 crore ($107.1 million) raised from strategic investors in January 2026, and lithium cell manufacturing is planned next.