Energy & grid

Intrastate Connectivity Flexibility Could Cut Renewable Energy Costs

India's Ministry of Power has decided to allow renewable energy projects tendered with interstate transmission system (ISTS) connectivity to use intrastate transmission system (InSTS) connectivity instead. The added flexibility could lower transmission costs for developers and improve the financial viability of projects. It is also expected to help accelerate the development of renewable energy capacity.

AI-written summary, checked against the cited sources. How summaries work

Image: Mercom India

Read at Mercom India