Intrastate Connectivity Flexibility Could Cut Renewable Energy Costs
India's Ministry of Power has decided to allow renewable energy projects tendered with interstate transmission system (ISTS) connectivity to use intrastate transmission system (InSTS) connectivity instead. The added flexibility could lower transmission costs for developers and improve the financial viability of projects. It is also expected to help accelerate the development of renewable energy capacity.
AI-written summary, checked against the cited sources. How summaries work
